Water Line Material Specifications:

Spec# Applies to (Click below to view specification) Revised
02-01 Ductile Iron Pipe 12/12/2006
02-02 Fittings 12/01/2005
02-03 Gate Valves 12/01/2005
02-04 Butterfly Valves 12/01/2005
02-05 Air Release Valves 12/01/2005
02-06 Fire Hydrants 08/21/2006
02-07 Tapping Sleeves, Tapping Valves, Insert & Cut-in Valves 12/01/2005
02-08 Joint Restraint Systems 03/06/2006
02-09 Valve Boxes 12/01/2005
02-10 Meter Boxes 06/12/2006
02-11 Meter Service Hardware 08/21/2006
02-12 Copper Tubing 02/01/2006
02-13 1 1/2 & 2 inch Meter Service Hardware and Meter Boxes 12/12/2006
02-14 Repair Clamps 12/01/2005
02-15 Repair Couplings 12/01/2005
02-16 In Building Stainless Steel Fire Line Riser 08/20/2007

Sewer Line Material Specifications:

Spec# Applies to (Click below to view specification) Revised
03-01 Gravity PVC Sewer Pipe 03/06/2006
03-02 Gravity DI Sewer Pipe 12/01/2005
03-03 Sewer Force Main 12/01/2005
03-04 Cast Iron Manhole Frames and Covers 06/12/2006
03-05 Gravity Sewer Miscellaneous 12/01/2005
03-06 Plug Valves 12/01/2005
03-07 Check Valves 12/01/2005
03-08 Air / Vacuum Valves 12/01/2005
03-09 Force Main Miscellaneous 12/01/2005
03-10 Service Saddles, Repair Couplings & Clamps 12/01/2005
03-11 Protective Manhole Coatings & Wet Well Liners 12/01/2005

Water / Sewer Line Material Specifications:

Spec# Applies to (Click below to view specification) Revised
04-01 Casing Spacers 12/01/2005
04-02 Steel Casing 12/01/2005
04-03 Pipe Bedding Materials 03/06/2006
04-04 Granular Backfill Materials 06/12/2006
04-05 Engineering Select Backfill Materials 06/12/2006
04-06 Flowable Fill Materials 06/12/2006
04-07 Concrete 08/21/2006
04-08 Reinforcing Steel 06/12/2006
04-09 Joint Sealant 08/21/2006
04-10 Asphalt Concrete Cold Plant Mix Material 08/20/2007

Water Line Construction Specifications:

Spec# Applies to (Click below to view specification) Revised
05-01 Pending  
05-02 Pending  
05-03 Directional Bore 08/21/2006

Sewer Line Construction Specifications:

Spec# Applies to (Click below to view specification) Revised
06-01 Pending  
06-02 Sanitary Sewer Manhole Construction 12/12/2006
06-03 Pending  
06-04 Sanitary Sewer Manhole Adjustments 08/21/2006
06-05 Sewer Lift Stations Specifications 08/15/2017

Sewer Line Construction Specifications:

Spec# Applies to (Click below to view specification) Revised
07-01 Excavation / Trenching 12/12/2006
07-02 Auger Jack and Bore 08/21/2006
07-03 Pipe Embedment 12/12/2006
07-04 Excavation / Trench Backfill 12/12/2006
07-05 Tap Sleeves and Valves 08/20/2007
07-06 Concrete Thrust Blocking 08/20/2007

Water / Sewer Line Testing:

Spec# Applies to (Click below to view specification) Revised
08-01 Pending  
08-02 Sanitary Sewer Manhole Testing 02/01/2006
08-03 Sanitary Sewer Main Low Pressure Air Testing 03/02/2006
08-04 Sanitary Sewer Main TV Inspection 02/01/2006
08-05 Sanitary Sewer Wet Well Testing 02/01/2006
08-06 Sanitary Sewer Main Hydrostatic Test 05/01/2006
08-07 Water Main Hydrostatic Test 05/01/2006
08-08 Water Main Disinfection 05/01/2006
08-09 Record Plan 01/21/2013

 

Customer Care

Call: 479-621-1142
Fax:  479-621-1146
Email: service@rwu.org

Physical Address:
Rogers Water Utilities
601 S 2nd Street
Rogers, Arkansas 72756
Mailing Address:
Rogers Water Utilities
P.O. Box 338
Rogers, Arkansas 72757

Still Have Questions?