|
|
Archive of Aged Announcements:
Effective June 9, 2006, developers will have the option of
setting 1-1/2” and 2” meters and construction of the related meter
boxes. RWU will continue to do these installations, if requested, but
do offer the Developer the opportunity to do this work providing better
control of their construction schedule. _____________________________________________ The Summary of Revision No. 9 encompasses the revision of Sections 02-07, 02-11 and 07-04 to the Water and Sanitary Sewer Standard Details; the addition of Sections 02-16, 04-10, 07-05 and 07-06 to the Standard Specifications; effective 8/16/2007. Summary of Revision No. 8 encompasses the revision of Sections 02-01, 02-13 and the Water and Sanitary Sewer Standard Details; the addition of Sections 06-02, 07-01, 07-03 and 07-04 to the Standard Specifications; effective 12/12/2006. The Summary of Revision No. 7 encompasses the revision of Sections 02-06, 02-11, 02-13 and 04-07 and the addition of Sections 04-09, 05-03, 06-04 and 07-02 to the Standard Specifications; effective 08/22/2006.
The Summary of Revision No. 6 encompasses the revision
of Sections 02-10 and 03-04 and the addition of 02-13, 04-04, 04-05,
04-06, 04-07 and 04-08 to the Materials Standard Specifications;
effective 06/12/2006. _____________________________________________
GUIDELINE ADDITIONS - 02/06/2006
Commercial Cross Connection Control and Fire Prevention System Guideline Checklist ____________________________________________________________
CHECKLIST ADDITIONS - 02/06/2006
RWU WATER SYSTEM INSPECTION ACCEPTANCE CHECKLIST RWU SEWER SYSTEM INSPECTION ACCEPTANCE CHECKLIST
_________________________________________________________ _________________________________________________________ Resolution 05-05 regarding water and sewer access and hookup fees is now available. _________________________________________________________ The RWU Utility Easement document is now available as a Word document. _________________________________________________________ The following sections are hereby revised in the Standard Specifications For Construction of Public Water and Sewer Improvements in the City of Rogers and Areas Under the Jurisdiction of Rogers Waterworks and Sewer Commission, dated August 1996, revised April 16, 1997. The summary of revisions is as follows:
The Summary of Revision No. 1 is Sections 02-01 through 04-02 of the Materials Standard Specifications: effective 12/12/2005.
The Summary of Revision No. 2 are Sections 02-12 and 04-03 of the Materials Standard Specifications and Section 08-07 of the Testing Specifications; effective 02/06/2006.
The Summary of Revision No. 3 is Sections 02-08, 03-01 and 04-03 of the Materials Standard Specifications and Sections 08-02 through 08-05 of the Testing Specifications; effective 03/06/2006. Section 08-07 of the Testing Specifications is now Section 08-02 of the Testing Specifications. Charging for the re-television inspection of the previous failed section of the sanitary sewer main(s) as stated in Section 08-04 of the Testing Specifications will be effective on 06/26/06.
The Summary of Revision No. 4 is Sections 02-06 and 02-011 of the Materials Standard Specifications and Section 08-03 of the Testing Specifications; effective 03/15/2006. Water and Sewer System Inspection Acceptance Checklist are also revised; effective 03/15/2006.
The The Summary of Revision No. 5 is the addition of Sections 08-06, 08-07 and 08-08 to the Testing Specifications; effective 05/01/2006.
|
| |
|
|
HOME About RWU At A
Glance Rates Direct Bank Draft Mission Statement
Our History Customer FAQs Conservation Check your Account Contact Us 601 S 2nd Street
· Rogers AR 72756
Phone: 479.621.1142 · Fax: 479.621.1146 |
|